Precautions for installation of welding roller frame

Mar 08, 2023 Tso lus

1. Before the equipment is installed, the foundation of the equipment must be prepared to ensure the normal maintenance period of the concrete and ensure that the installation position of the equipment is on the same level.
2. When installing the equipment, install and fix the equipment according to the installation requirements of general equipment. It can be fixed with expansion bolts (or fixed with a pressure plate). During installation, the two sets of rollers must be placed in parallel, and their centers should be consistent. part integrity.
3. After the equipment is installed, check whether each part of the equipment meets the assembly requirements, and ensure the normality of the electrical wiring of each part, check and clean the periphery of the equipment, and ensure that there are no obstacles that affect the normal operation of the equipment. Only after several tasks have been successfully completed should the device be powered on for operation.
The adjustable roller frame has only one roller part which is a driving roller part, and the other is a driven roller part. The driving device adopts frequency conversion speed regulation motor, and the roller parts are driven by the reducer, and the weldment is driven to rotate for welding. The adjustment of the distance between the roller parts in each roller frame is done manually by using positioning bolts according to the condition of the weldment. Therefore, the function of the adjustable roller frame circuit can be said to be the direct factor determining its driving device.